Friday, 13 April 2012

3 Phase Electricity Connection

Today our Electrical Contractor excavated a trench approximately 40 metres diagonally from the front boundary to run cable within conduit for the connection of our requested 3 Phase Power approved/granted by Powercor.

Excavation of a trench where the main Smart Meter Box will be located on the South side of our new home.
Two young apprentices learning how to join conduit

That's alot of conduit


That's a big hole ..... 
A largish boulder dug out from the trench ... and yes, another landscaping rock!

Preparing to dig the start of the trench from the Electricity Pit which is shared by us and our adjoining neighbour. Note that our new neighbours loved our fencing so much that they appointed the same Contractor to build them one too..... Awesome!


















Such precision ..... so that's how it's done
Our Shed Contractor is on site preparing for the erection of our new Shed.