Galvanised Steel Beam positioned over one of the Sliding Doors adjacent to Kitchen |
The remainder of Posts and Beams in Position |
Plumber sets up Temporary Site Toilet to Septic and connects water so as to be able to flush. Therefore no need to have the toilet periodically emptied by professionals |
West elevation of house to date |
North West elevation |
North elevation |
North again |
Alfresco Steelwork in place |
North elevation |
East Elevation |
The first five trucks of Free Fill delivered today |
South East elevation and looking between the Man Shed and the new house |