Tuesday, 7 May 2013

Widening of Boundary Crossover & Site Cut

Had a months worth of issues with the Postal Contractor. In rural areas, the mail and/or parcels are delivered via Motor Vehicle unlike suburban areas where they are delivered by Motorbike.

The day following our commissioning of our new Tree Trunk Letterbox, which you would have noticed is positioned on the left of our Crossover and Driveway, a dispute was started by a disgruntled Postal Contractor. She refused to deliver our mail, stating that according to Australia Post, we "must" have our letterbox on the Right side of the Crossover, not the left, must have a street number, not a Lot number, and the property must contain a residence, not an empty parcel of land.

To cut a long story short, we were right and she was wrong.

Australia Post confirmed that any property with a Letterbox must be delivered to regardless of whether a dwelling exists or not.

Our reason for setting up our Letterbox on the Left hand side of the crossover was simply because we had a water mains on the Right side and due to the weight and size of the structure, we were unable to position it there.

We were at no time trying to make life difficult for anyone. 

We widened our crossover to assist the many future heavy vehicles and machinery to gain easier access to our property for delivery of materials and this also enabled the Postal Contractors Motor vehicle to swing in and exit easily when delivering our mail.

All has been resolved and now we are receiving mail, mainly Bills and Invoices.

The Excavator Contractor also did a site cut, levelled out and moved rocks in the location of our future Slab.





















Sunday, 14 April 2013

Lined a South Facing Shed Wall

It's now a mad rush to get the Man Shed ready as our Home settles in 8 days.

Decided to insulate and plaster yet another wall to help retain heat over the coming Winter months.



Wall almost ready for painting
 This is our wood heater in operation now that the Roof Plumber has installed the Flue.


This is our Heller Bench Top Oven which we've positioned under bench quite nicely .... cooking up a quick lunch - Mini Pizza's.


A now completed Kitchen



Wednesday, 10 April 2013

Septic Installation Day


Finally, it's Septic installation Day.

Huge, deep trench excavated and ready for the three tanks.





Truck arrives carting three tanks and associated equipment.












Placed into position, covered and commissioned.



Flushing toilets at last!

Monday, 8 April 2013

Bathroom finished and ready to clean and seal

Kitchen and Bathroom grout applied and ready to clean and seal. 


Shower ready for cleaning and Shower Rail fitting

Dishwasher, Washing Machine Taps ready for Fittings







Vanity in position and ready to go



Friday, 5 April 2013

Tiling finished and ready to grout

Tiling complete and ready to grout








Children chalk drawing on the road with neighbouring friends