Monday 20 February 2012

The Man Shed .... Setting up for a Slab - Day 1

Slab Contractor appointed .... setting up for the Shed's Slab. Plumber turns up to set up pipework for the Shed's Bathroom and Kitchen. This is to be a three day process. Weather looks dismal but holds out over the three days and all goes to plan perfectly.
Excavator & Bobcat Arrives 
Plumber here for the Kitchen & Bathroom Pipework
The excavation begins ........




Plumber & Concreter discussing placement of pipework

Footing holes and sand being prepared

Capturing the action on Video Camera



Formwork being set up around the perimeter of the Shed and Concreter removing excess soil from the footings