Sunday 14 April 2013

Lined a South Facing Shed Wall

It's now a mad rush to get the Man Shed ready as our Home settles in 8 days.

Decided to insulate and plaster yet another wall to help retain heat over the coming Winter months.



Wall almost ready for painting
 This is our wood heater in operation now that the Roof Plumber has installed the Flue.


This is our Heller Bench Top Oven which we've positioned under bench quite nicely .... cooking up a quick lunch - Mini Pizza's.


A now completed Kitchen



Wednesday 10 April 2013

Septic Installation Day


Finally, it's Septic installation Day.

Huge, deep trench excavated and ready for the three tanks.





Truck arrives carting three tanks and associated equipment.












Placed into position, covered and commissioned.



Flushing toilets at last!

Monday 8 April 2013

Bathroom finished and ready to clean and seal

Kitchen and Bathroom grout applied and ready to clean and seal. 


Shower ready for cleaning and Shower Rail fitting

Dishwasher, Washing Machine Taps ready for Fittings







Vanity in position and ready to go



Friday 5 April 2013

Tiling finished and ready to grout

Tiling complete and ready to grout








Children chalk drawing on the road with neighbouring friends


Thursday 4 April 2013

Time to Move on the Septic Treatment Plant


We're finally on our way to having the Septic installed and up and running.

Plumber and Digger at work excavating where the septic pipework will run. 











Rock for placing around pipework delivered
In addition, Mains Water trenching some 50 metres to the front boundary for the Man Shed and the future House.



Utilised the Services of our Excavating Contractor to lift and move our heavy Tree Trunk Letter Box into position. The weight is approximately 300 kg and impossible to shift without such machinery.





Stainless Steel Letter Box in position and our House number .... all Done
Ready to receive Mail .... well that's another Story!!