Thursday, 4 April 2013

Time to Move on the Septic Treatment Plant


We're finally on our way to having the Septic installed and up and running.

Plumber and Digger at work excavating where the septic pipework will run. 











Rock for placing around pipework delivered
In addition, Mains Water trenching some 50 metres to the front boundary for the Man Shed and the future House.



Utilised the Services of our Excavating Contractor to lift and move our heavy Tree Trunk Letter Box into position. The weight is approximately 300 kg and impossible to shift without such machinery.





Stainless Steel Letter Box in position and our House number .... all Done
Ready to receive Mail .... well that's another Story!!