| South Wall Framing almost complete | 
|  | 
| Framing is moving forward towards the East (Front) of the House | 
|  | 
| North Side of House | 
|  | 
| East (Portico) with Bedroom 1 Corner Wall | 
|  | 
| East (Portico) with Bedroom 1 to the Left and Garage is on the right | 
|  | 
| Bedroom 1 (East) and adjacent WIR stepped back | 
|  | 
| Looking towards the front from Rumpus Room (into Pantry and Kitchen) | 
|  | 
| Main Bathroom Shower alcove with Toilet pipework behind Rear Shower Wall | 
|  | 
| Main Bathroom Toilet alcove with Shower Alcove on opposite wall | 
|  | 
| Yet another delivery of rock over 90m3 worth. This will be spread out around the perimeter of the House to assist trades with a hard and dryer surface to work from | 
|  | 
| South West Corner framing is WIR and to the right is our Master Bedroom | 
|  | 
| From Left to Right on Eastern Elevation is WIR, Bedroom 1, Foyer & Double Garage | 
|  | 
| Facing North and behind the Garage (with internal access) is the Laundry. | 
|  | 
| Looking towards the Foyer with Family Room on Left and what is to be the Dining Room on the Right. There will be a Powder Room accessed from the Foyer | 
|  | 
| Standing at where the Kitchen will be toward the open Family and Dining Rooms, with Home Theatre on Right and Foyer Directly in front | 

 