South Wall Framing almost complete |
Framing is moving forward towards the East (Front) of the House |
North Side of House |
East (Portico) with Bedroom 1 Corner Wall |
East (Portico) with Bedroom 1 to the Left and Garage is on the right |
Bedroom 1 (East) and adjacent WIR stepped back |
Looking towards the front from Rumpus Room (into Pantry and Kitchen) |
Main Bathroom Shower alcove with Toilet pipework behind Rear Shower Wall |
Main Bathroom Toilet alcove with Shower Alcove on opposite wall |
Yet another delivery of rock over 90m3 worth. This will be spread out around the perimeter of the House to assist trades with a hard and dryer surface to work from |
South West Corner framing is WIR and to the right is our Master Bedroom |
From Left to Right on Eastern Elevation is WIR, Bedroom 1, Foyer & Double Garage |
Facing North and behind the Garage (with internal access) is the Laundry. |
Looking towards the Foyer with Family Room on Left and what is to be the Dining Room on the Right. There will be a Powder Room accessed from the Foyer |
Standing at where the Kitchen will be toward the open Family and Dining Rooms, with Home Theatre on Right and Foyer Directly in front |