Tuesday, 9 July 2013

.... and Framing continues on Tuesday

South Wall Framing almost complete
Framing is moving forward towards the East (Front) of the House
North Side of House
East (Portico) with Bedroom 1 Corner Wall
East (Portico) with Bedroom 1 to the Left and Garage is on the right
Bedroom 1 (East) and adjacent WIR stepped back 
Looking towards the front from Rumpus Room (into Pantry and Kitchen)
Main Bathroom Shower alcove with Toilet pipework behind Rear Shower Wall
Main Bathroom Toilet alcove with Shower Alcove on opposite wall
Yet another delivery of rock over 90m3 worth.
This will be spread out around the perimeter of the House to assist trades with a hard and dryer surface to work from

South West Corner framing is WIR and to the right is our Master Bedroom
From Left to Right on Eastern Elevation is WIR, Bedroom 1, Foyer & Double Garage
Facing North and behind the Garage (with internal access) is the Laundry.
Looking towards the Foyer with Family Room on Left and what is to be the Dining Room on the Right. There will be a Powder Room accessed from the Foyer
Standing at where the Kitchen will be toward the open Family and Dining Rooms, with Home Theatre on Right and Foyer Directly in front

Carpenters making progress again today on a Cold but Sunny and Windfree day. They are absolute perfectionists and we are very please with the quality of their workmanship.

No comments: