Saturday 24 August 2013

Windows installed and a Huge Clean Up inside

Yesterday, the Carpenters installed our delivered Rylock Windows. They look fantastic.

Today, (Saturday) we pressure cleaned the slab as it was filthy with mud stains and sawdust from the last month of work with nothing but Wind and Rain.

Bricklayer turned up on site today to inspect his job in the coming weeks. 

We had two truck loads of soil delivered which was through us advertising our Wanted Ad for Clean Fill. The quality of soil is fantastic. Just waiting for some sunny days to dry the wet ground on our property so that we can move some of the soil around in preparation for the commencement of landscaping. 

South Side Windows from Rear, Bedroom 3, Bathroom, Bedroom 2, Theatre Room and the very last window is our Ensuite
No Windows on the West rear wall. Another 30,000 Litre Water Tank like the one on the rear of our shed will be positioned here
North Side windows, rear is Bedroom 4, Rumpus Room and then the Alfresco Sliding Doors
From the Front (east) first window is Walk In Robe, then Master Bedroom with it's three windows.
WIR, Master Bedroom, Portico and Garage with two large single doors to the right 

 


North side with Laundry Window, verandah and Library window to the right

Alfresco with Sliding Doors

Garage

Sills for our windows and some of the soil to the left delivered today 
A much cleaner slab now after the big pressure clean
Our Portico looking up
South Elevation
All of this soil has been delivered over the last couple of months

East from the Front Boundary Gates