Friday, 10 August 2012

Let there be Light! ..... Finally Electricals connected.

Today our Electrician installed Fluro Lights, Powerpoints, Hot Water Service, Hotplates and external Sensor Lights. Lighting is all low voltage. 

Cooking Dinner (Burgers) as the Hot Plates are connected
Lights


Tiling Floor in Bathroom has commenced


A couple of mm has to be shaved off the bottom of the Bathroom Door to allow opening and closing

Switchboard mounted and Light Switches
Hot Water Unit in position and connected. Now the Plumber needs to finish off his water connection.
Tiles in Kitchen now ready for Grouting
Taking it all in

A Shed tidy up and reorganisation creates a bigger space to work in and walk around



Love the Kitchen

Wednesday, 8 August 2012

An eventful day in the Man-Shed!

Quite an eventful day today with the following projects:
  1. Waterproofing completed in Bathroom
  2. Cornice on Shed North Wall installed
  3. Plaster received a final Skim Coat
  4. Holes in Door Architraves and Skirting Punched and Puttied
  5. Commenced Tiling in Kitchen
Ardex SuperFlex WPM 001 - Waterproofing Membrane - Brushed and Rolled
Now Dry First Coat
Completed Second Coat. Quite a lovely shade of Blue







The last of cornice installed on Northern Shed Wall
Let the Tiling begin .....!
Missing tiles need to be cut with hole saw attachment

An absolute Perfect Match in Tile & Kitchen colours 

Will continue with tiling tomorrow 
Plaster walls skimmed, then need sanding prior to painting





Tuesday, 7 August 2012

Waterproofing the Man-Shed Bathroom

Waterproofing Membrane we have chosen to use for our Shed Bathroom





First Coat completed and now requires drying before a second coat

Thursday, 2 August 2012

Bathroom Primed, Plaster Second Coated, and almost ready to Tile & Paint

Second coat has been applied to Villa Board and sanded. 

Today we primed the bathroom walls and floor in preparation for the Waterproofing. This is required prior to Tiling. 

Ardex Water Based Primer we have chosen to use in the Bathroom
Bathroom
Bathroom
Bathroom
Bathroom 
External Bathroom Wall with Cornice fixed
Living Room Wall
Second Coat above Kitchen Cabinets 
More Ceramic Underlay fitted to wall where tiles will be layed.
The orange cable will be for our Stiebel Eltron DEL Instantaneous Hot Water System

http://www.stiebel.com.au/water-heating/products/del-instantaneous-3-phase-water-heater/

Stainless Steel Electric Hot Plates

Our Bathroom Vanity Unit
Architraves fitted around Bathroom Door and Skirting either side
Timber Cornice will be Painted same as Wall colour



Timber Cornice in Kitchen
The mass of wires will be housed within a Swithboard. The orange is 3 Phase Cable. The Box is our Live Video Alarm Control Panel which is GPRS Monitored
Skirting fixed
Stiebel Eltron Slimline CNS Electric wall mounted Panel Heater for our Bathroom

Electrician has been scheduled to attend next week so as to start Fitting off and installing light fittings, power points and switches.